CPWD Analysis of Rates · Flooring
Deduct for not using 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) bedding in laying of floor tiles and jointing with grey cement slurry @ 3.3 kg/ sqm
- Item number
- 11.42
- Analysis basis
- Detail of cost for 10 sqm
- Priced inputs
- 6
- Derived rate
- ₹850.10 / sqm
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 11.42 — Deduct for not using 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) bedding in laying of floor tiles and jointing with grey cement slurry @ 3.3 kg/ sqm — is derived from 6 priced inputs for 10 sqm and works out to ₹850.10 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
- Cement mortar 1 : 4 (1 cement : 4 coarse
- sand)
- Cement for slurry over bed @ 3.3 kg per
- sqm
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| Rate as per Item Number 3.9 of SH: MortarsRate as per item 3.9Sub-analysis | cum | 0.24 | 4,211.70 | 1,010.81 | |
| 9999 | Mortar for pointing in white cementMaterial | L.S. | 404.3 | 2.27 | 917.76 |
| 0367 | Portland CementPortland Cement (OPC-43 Grade)Material | tonne | 0.033 | 5,156.00 | 170.15 |
| 0123 | Mason 1st classMason 1st classLabour | day | 2 | 897.00 | 1,794.00 |
| 0115 | CoolieLabour | day | 2 | 736.00 | 1,472.00 |
| 9988 | Sundries i/c carriage of cement etc.Material | L.S. | 269.1 | 2.27 | 610.86 |
- TOTAL
- 5,975.58
- Add 1 % Water charges on “W”
- 59.76
- TOTAL
- 6,035.34
- Add GST on “X” (multiplying factor 0.2127)
- 1,283.72
- TOTAL
- 7,319.06
- Add 15% CPOH on “Y”
- 1,097.86
- TOTAL
- 8,416.92
- Add Cess @ 1% on “Z”
- 84.17
- Cost of 10 sqm
- 8,501.09
- Cost for 1 sqm
- 850.11
- Say
- 850.10
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 826. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.