Skip to main content
R/DAR 2023

Precast terrazo tiles 22 mm thick with graded marble chips of sizes upto 12 mm, in skirting

Ordinary cement without any pigment
Item number
11.18.4
Analysis basis
10 sqm
Priced inputs
10
Derived rate
₹2,229.15/ SQM
D-01/RATE ANALYSISITEM 11.18.4

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 11.18.4 (Precast terrazo tiles 22 mm thick with graded marble chips of sizes upto 12 mm, in skirting Ordinary cement without any pigment) is derived from 10 priced inputs for 10 sqm and works out to ₹2,229.15 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • Cement mortar 1:3 (1 cement : 3 coarse
  • sand)
  • Grey cement for sturry
  • [4.62+2.84 (for tiles)]
  • Less for dark shade pigment
ANALYSIS OF RATES · ITEM 11.18.4DETAILS OF COST FOR 10 SQM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
1203MATPrecast terrazo tiles 22 mm thick (dark shade) including wastage & breakagePrecast terrazzo tiles 22 mm thick (dark shade)sqm11285.003,135.00
9977MATCarriage of tilesL.S.40.432.2791.78
SUBRate as per Item Number 3.8 of SH: MortarsRate as per item 3.8cum0.1444,881.95703.00
0367MATPortland CementPortland Cement (OPC-43 Grade)tonne0.0665,156.00340.30
0874MATBlack colour dark shade pigmentkilogram4.6275.00346.50
0124LABMason 2nd classMason 2nd classday3.25816.002,652.00
0115LABCoolieday3.25736.002,392.00
0139LABSkilled Beldar (for floor rubbing etc.)day7.6816.006,201.60
9999MATSundries including pigment wherever required, carborandum stone and polishing powder etcL.S.161.462.27366.51
0874MATBlack colour dark shade pigmentkilogram-7.4675.00-559.50
BUILD-UP TO RATE
TOTAL
15,669.19
Add 1 % Water charges on “W”
+156.69
TOTAL
15,825.88
Add GST on “X” (multiplying factor 0.2127)
+3,366.16
TOTAL
19,192.04
Add 15% CPOH on “Y”
+2,878.81
TOTAL
22,070.85
Add Cess @ 1% on “Z”
+220.71
Cost of 10 sqm.
22,291.56
Cost of 1 sqm.
2,229.16
SAY
₹2,229.15
D-02/SOURCEPRINTED PAGE 783
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
783

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 783. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSFLOORING
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.