Skip to main content
R/DAR 2023

Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete

Item number
13.91
Analysis basis
10 sqm
Priced inputs
5
Derived rate
₹25.15/ SQM
D-01/RATE ANALYSISITEM 13.91

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 13.91 (Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete) is derived from 5 priced inputs for 10 sqm and works out to ₹25.15 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 13.91DETAILS OF COST FOR 10 SQM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0114LABBeldarday0.11736.0080.96
0115LABCoolieday0.05736.0036.80
0101LABBhistiday0.05816.0040.80
9999MATScrapper, sand paper etc.L.S.6.242.2714.16
9999MATSundries including mortar to repair the surfaceL.S.1.822.274.13
BUILD-UP TO RATE
TOTAL
176.85
Add 1 % Water charges on “W”
+1.77
TOTAL
178.62
Add GST on “X” (multiplying factor 0.2127)
+37.99
TOTAL
216.61
Add 15% CPOH on “Y”
+32.49
TOTAL
249.10
Add Cess @ 1% on “Z”
+2.49
Cost of 10 sqm.
251.59
Cost of 1 sqm.
25.16
SAY
₹25.15
D-02/SOURCEPRINTED PAGE 1016
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1016

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1016. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSFINISHING
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.