Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete

Item number
13.88
Analysis basis
10 sqm
Priced inputs
5
Derived rate
₹19.75/ SQM
D-01/RATE ANALYSISITEM 13.88

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 13.88 (Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete) is derived from 5 priced inputs for 10 sqm and works out to ₹19.75 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 13.88DETAILS OF COST FOR 10 SQM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0114LABBeldarday0.09736.0066.24
0115LABCoolieday0.04736.0029.44
0101LABBhistiday0.04816.0032.64
9999MATSundries such as sand paper and scrapperL.S.2.732.276.20
9999MATRepair to scrachesL.S.1.822.274.13
BUILD-UP TO RATE
TOTAL
138.65
Add 1 % Water charges on “W”
+1.39
TOTAL
140.04
Add GST on “X” (multiplying factor 0.2127)
+29.79
TOTAL
169.83
Add 15% CPOH on “Y”
+25.47
TOTAL
195.30
Add Cess @ 1% on “Z”
+1.95
Cost of 10 sqm.
197.25
Cost of 1 sqm.
19.73
SAY
₹19.75
D-02/SOURCEPRINTED PAGE 1016
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1016

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1016. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSFINISHING
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.