CPWD Analysis of Rates · Finishing
Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content
With water thinnable cement primer on wall surface having VOC content less than 50 grams/ litre
- Item number
- 13.85.3
- Analysis basis
- Detail of cost for 10 sqm
- Priced inputs
- 4
- Derived rate
- ₹73.95 / sqm
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 13.85.3 — Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content With water thinnable cement primer on wall surface having VOC content less than 50 grams/ litre — is derived from 4 priced inputs for 10 sqm and works out to ₹73.95 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 0808 | Water thinnable cement primer for interior wall surface, having VOC content less than 50 gms/litWater thinnable cement primer for interior wall surface, having VOC content less than 50 grams/ litreMaterial | litre | 0.7 | 40.00 | 28.00 |
| 9988 | Sundries for brushes,sand paper & putty for filling holes including Carriage for primerMaterial | L.S. | 8.06 | 2.27 | 18.30 |
| 0131 | PainterLabour | day | 0.4 | 816.00 | 326.40 |
| 0115 | CoolieLabour | day | 0.2 | 736.00 | 147.20 |
- TOTAL
- 519.90
- Add 1 % Water charges on “W”
- 5.20
- TOTAL
- 525.10
- Add GST on “X” (multiplying factor 0.2127)
- 111.69
- TOTAL
- 636.79
- Add 15% CPOH on “Y”
- 95.52
- TOTAL
- 732.31
- Add Cess @ 1% on “Z”
- 7.32
- Cost of 10.00 sqm
- 739.63
- Cost of 1.00 sqm
- 73.96
- Say
- 73.95
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1014. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works