CPWD Analysis of Rates · Finishing
Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour
One coat
- Item number
- 13.83.1
- Analysis basis
- Detail of cost for 10 sqm
- Priced inputs
- 6
- Derived rate
- ₹95.45 / sqm
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 13.83.1 — Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour One coat — is derived from 6 priced inputs for 10 sqm and works out to ₹95.45 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 0804 | Premium acrylic emulsion of interior grade, having VOC content less than 50 gm/ltrPremium plastic acrylic emulsion of interior grade, having VOC content less than 50 grams/ litreMaterial | litre | 0.38 | 210.00 | 79.80 |
| 9999 | For filling holes and cracks with putty etcMaterial | L.S. | 5.33 | 2.27 | 12.10 |
| 9977 | Carriage of materialMaterial | L.S. | 0.91 | 2.27 | 2.07 |
| 0131 | PainterLabour | day | 0.36 | 816.00 | 293.76 |
| 0115 | CoolieLabour | day | 0.36 | 736.00 | 264.96 |
| 9999 | Sundries for brushes,sand paper,scaffolding etcMaterial | L.S. | 8.06 | 2.27 | 18.30 |
- TOTAL
- 670.99
- Add 1 % Water charges on “W”
- 6.71
- TOTAL
- 677.70
- Add GST on “X” (multiplying factor 0.2127)
- 144.15
- TOTAL
- 821.85
- Add 15% CPOH on “Y”
- 123.28
- TOTAL
- 945.13
- Add Cess @ 1% on “Z”
- 9.45
- Cost of 10.00 sqm
- 954.58
- Cost of 1.00 sqm
- 95.46
- Say
- 95.45
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1012. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works