CPWD Analysis of Rates · Finishing
Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade
New work (two or more coats) including a coat of approved steel primer but excluding a coat of mordant solution
- Item number
- 13.53.1
- Analysis basis
- Detail of cost for 10 sqm
- Priced inputs
- 11
- Derived rate
- ₹180.85 / sqm
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 13.53.1 — Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : New work (two or more coats) including a coat of approved steel primer but excluding a coat of mordant solution — is derived from 11 priced inputs for 10 sqm and works out to ₹180.85 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
- PRIMING COAT
- Synthetic enamel painting
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 4202 | Red oxide Zinc chromate primerMaterial | litre | 0.36 | 140.00 | 50.40 |
| 9977 | CarriageMaterial | L.S. | 0.39 | 2.27 | 0.89 |
| 0131 | PainterLabour | day | 0.12 | 816.00 | 97.92 |
| 0114 | BeldarLabour | day | 0.12 | 736.00 | 88.32 |
| 9999 | Brushes, sand paper etcMaterial | L.S. | 7.15 | 2.27 | 16.23 |
| 0834 | Synthetic enamel paint in all shades except black or chocolate shadeMaterial | litre | 0.8 | 178.00 | 142.40 |
| 9977 | CarriageMaterial | L.S. | 1.43 | 2.27 | 3.25 |
| 0131 | PainterLabour | day | 0.54 | 816.00 | 440.64 |
| 0115 | CoolieLabour | day | 0.54 | 736.00 | 397.44 |
| 9999 | Putty, brushes, sand paper etcMaterial | L.S. | 6.76 | 2.27 | 15.35 |
| 9999 | SundriesMaterial | L.S. | 8.06 | 2.27 | 18.30 |
- TOTAL
- 1,271.14
- Add 1 % Water charges on “W”
- 12.71
- TOTAL
- 1,283.85
- Add GST on “X” (multiplying factor 0.2127)
- 273.07
- TOTAL
- 1,556.92
- Add 15% CPOH on “Y”
- 233.54
- TOTAL
- 1,790.46
- Add Cess @ 1% on “Z”
- 17.90
- Cost of 10.00 sqm
- 1,808.36
- Cost of 1.00 sqm
- 180.84
- Say
- 180.85
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 993. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.