Applying priming coat

With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat)
Item number
13.50.4
Analysis basis
10 sqm
Priced inputs
5
Derived rate
₹36.10/ SQM
D-01/RATE ANALYSISITEM 13.50.4

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 13.50.4 (Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat)) is derived from 5 priced inputs for 10 sqm and works out to ₹36.10 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 13.50.4DETAIL OF COST FOR 10 SQM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
4202MATRed oxide Zinc chromate primerlitre0.36140.0050.40
9977MATCarriageL.S.0.392.270.89
0131LABPainterday0.12816.0097.92
0115LABCoolieday0.12736.0088.32
9999MATBrushes,sand paper including sundriesL.S.7.152.2716.23
BUILD-UP TO RATE
TOTAL
253.76
Add 1 % Water charges on “W”
+2.54
TOTAL
256.30
Add GST on “X” (multiplying factor 0.2127)
+54.52
TOTAL
310.82
Add 15% CPOH on “Y”
+46.62
TOTAL
357.44
Add Cess @ 1% on “Z”
+3.57
Cost of 10.00 sqm
361.01
Cost of 1.00 sqm
36.10
SAY
₹36.10
D-02/SOURCEPRINTED PAGE 991
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
991

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 991. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSFINISHING
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.