R/DAR 2023

Applying priming coat

With ready mixed aluminium primer of approved brand and manufacture on resinous wood and plywood
Item number
13.50.2
Analysis basis
10 sqm
Priced inputs
6
Derived rate
₹74.65/ SQM
D-01/RATE ANALYSISITEM 13.50.2

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 13.50.2 (Applying priming coat: With ready mixed aluminium primer of approved brand and manufacture on resinous wood and plywood) is derived from 6 priced inputs for 10 sqm and works out to ₹74.65 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 13.50.2DETAIL OF COST FOR 10 SQM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
4201MATAluminium primerlitre0.75140.00105.00
9999MATPuttyL.S.2.732.276.20
9977MATCarriageL.S.0.392.270.89
0131LABPainterday0.25816.00204.00
0115LABCoolieday0.25736.00184.00
9999MATSundries for Brushes, sand paper etcL.S.10.792.2724.49
BUILD-UP TO RATE
TOTAL
524.58
Add 1 % Water charges on “W”
+5.25
TOTAL
529.83
Add GST on “X” (multiplying factor 0.2127)
+112.69
TOTAL
642.52
Add 15% CPOH on “Y”
+96.38
TOTAL
738.90
Add Cess @ 1% on “Z”
+7.39
Cost of 10.00 sqm
746.29
Cost of 1.00 sqm
74.63
SAY
₹74.65
D-02/SOURCEPRINTED PAGE 990
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
990

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 990. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.