CPWD Analysis of Rates · Earth Work

Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion)

Treatment at points of contact of wood work by chemical emulsion Chlorpyriphos/ Lindane (in oil or kerosene based solution) @ 0.5 litres per hole by drilling 6 mm dia holes at downward angle of 45 degree at 150 mm centre to centre and sealing the same

Item number
2.35.5
Analysis basis
Details of cost for 10 metres
Priced inputs
4
Derived rate
279.70 / metres

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 2.35.5 Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Treatment at points of contact of wood work by chemical emulsion Chlorpyriphos/ Lindane (in oil or kerosene based solution) @ 0.5 litres per hole by drilling 6 mm dia holes at downward angle of 45 degree at 150 mm centre to centre and sealing the same — is derived from 4 priced inputs for 10 metres and works out to ₹279.70 per metres after water charges, GST, CPOH and cess. The full build-up is below.

  • No. of holes 10.0/0.15 = 66.67+1 = 67.67
  • holes. Say 68 holes
  • Chlordane 1% concentration required = 68 x
  • 0.5 = 34.00 litres
  • Chlordane 20% E.C. required 34.00/20=1.70
  • litres
  • Chlordane 20% E.C./ Lindane 20% E.C. 1.7
  • litres (to be supplied free of cost)
  • Kerosene oil = 34-1.7 = 32.30 litres
  • (For making holes and plugging the same)
  • for injecting chemical
CodeInputUnitQuantityRate (INR)Amount (INR)
0771Kerosene oilMateriallitre32.350.001,615.00
0112Carpenter 2nd classLabourday0.2816.00163.20
0114BeldarLabourday0.2736.00147.20
9999SundriesMaterialL.S.17.942.2740.72
TOTAL
1,966.12
Add 1 % Water charges on “W”
19.66
TOTAL
1,985.78
Add GST on “X” (multiplying factor 0.2127)
422.38
TOTAL
2,408.16
Add 15% CPOH on “Y”
361.22
TOTAL
2,769.38
Add Cess @ 1% on “Z”
27.69
Cost for 10 metres
2,797.07
Cost for 1 metre
279.71
Say
279.70

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 137. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.