CPWD Analysis of Rates · Earth Work

Banking excavated earth by mechanical / manual means in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and for all lift

All kinds of soil

Item number
2.3.1
Analysis basis
Details of cost for 10 cum.
Priced inputs
7
Derived rate
197.90 / cum

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 2.3.1 Banking excavated earth by mechanical / manual means in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and for all lift : All kinds of soil — is derived from 7 priced inputs for 10 cum and works out to ₹197.90 per cum after water charges, GST, CPOH and cess. The full build-up is below.

CodeInputUnitQuantityRate (INR)Amount (INR)
0049Dozer 80 HP for spreadingDozer 80 HPMachineryhour0.3741,700.00635.80
0050Motor grader for gradingMotor Grader 3.35 metre bladeMachineryhour0.1672,700.00450.90
0054Vibrator roller 8-10 tonneVibratory roller 8 to 10 tonneMachineryhour0.167700.00116.90
0057Water tanker 6 KL capacityWater Tanker 5 to 6 KL capacityMachineryhour0.4250.00100.00
0128MateLabourday0.004816.003.26
0115CoolieLabourday0.1736.0073.60
9999Sundries (i.e. watch and ward, minor T&P etc.)MaterialL.S.4.612.2710.46
TOTAL
1,390.92
Add 1 % Water charges on “W”
13.91
TOTAL
1,404.83
Add GST on “X” (multiplying factor 0.2127)
298.81
TOTAL
1,703.64
Add 15% CPOH on “Y”
255.55
TOTAL
1,959.19
Add Cess @ 1% on “Z”
19.59
Cost of 10 cum.
1,978.78
Cost of 1 cum.
197.88
Say
197.90

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 94. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.