Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 2.24.2 (Extra rates for quantities of works, executed: In or under foul position, including pumping out water as required) is derived from 0 priced inputs. The full build-up is below.
- Extra due to slow progress and dewatering:
- 25% of the rate of the item
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|
- Cost of 1 metre depth
- —
- SAY
- ₹—
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 127
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 127. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.