CPWD Analysis of Rates · Earth Work

Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed, within a lead of 50 m : Ordinary rock

Pipes, cables exceeding 300 mm dia but not exceeding 600 mm dia

Item number
2.13.1.3
Analysis basis
Details of cost for 30 m. length of a pipe of
Priced inputs
3
Derived rate
1,149.10 / m

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 2.13.1.3 Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed, within a lead of 50 m : Ordinary rock : Pipes, cables exceeding 300 mm dia but not exceeding 600 mm dia — is derived from 3 priced inputs for 30 m and works out to ₹1,149.10 per m after water charges, GST, CPOH and cess. The full build-up is below.

  • an average dia. say 450mm.
  • Slope assumed 1 in 200.
  • ExcavationMinimum depth of trench.
  • 0.75+0.15+0.45 = 1.35m
  • Average depth = (1.35+1.50)/2 = 1.425m
  • Minimum width of trench = 0.90m
  • 30x0.90x1.425 = 38.475 cum.
  • 5% for collar = 1.924cum
  • Total = 40.399cum
CodeInputUnitQuantityRate (INR)Amount (INR)
Rate as per item No. 2.9.1 of SH: Earth WorkRate as per item 2.9.1Sub-analysiscum40.399632.9525,570.55
Rate as per item No.2.25 of SH: Earth WorkRate as per item 2.25Sub-analysiscum40.399196.007,918.20
0114BeldarLabourday0.94736.00691.84
TOTAL
34,180.59
Add 1 % Water charges on “W-A”
6.92
TOTAL
34,187.51
Add GST on “X-A” (multiplying factor 0.2127)
148.63
TOTAL
34,336.14
Add 15% CPOH on “Y-A”
127.11
TOTAL
34,463.25
Add Cess @ 1% on “Z-A”
9.74
Cost for 30 m length of a pipe
34,472.99
Cost for one m length of a pipe
1,149.10
Say
1,149.10

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 102. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.