Skip to main content
R/DAR 2023

Extra for depth for manholes : Size 120x90 cm

With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
Item number
19.8.2.1
Analysis basis
one metre
Priced inputs
2
Derived rate
₹10,585.50/ ONE METRE
D-01/RATE ANALYSISITEM 19.8.2.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 19.8.2.1 (Extra for depth for manholes : Size 120x90 cm With common burnt clay F.P.S. (non modular) bricks of class designation 7.5) is derived from 2 priced inputs for one metre and works out to ₹10,585.50 per one metre after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • Brick work with bricks of class designation 7.5 in cement mortar 1:4 (1 cement
  • 4: coarse sand )
  • 5.12x0.23x1.0 m = 1.178 cum Say 1.18 cum
  • 12 mm cement plaster 1:3 (1 cement : 3
  • coarse sand) finished with floating coat of
  • neat cement
  • 4.20x1 m = 4.20 sqm
ANALYSIS OF RATES · ITEM 19.8.2.1DETAILS OF COST FOR ONE METRE
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
SUBRate as per item no. 6.1.1 of S.H : brick workRate as per item 6.1.1cum1.187,370.658,697.37
SUBRate as per item no 13.9.1 of SH : FinishingRate as per item 13.9.1sqm4.2449.551,888.11
BUILD-UP TO RATE
TOTAL
10,585.48
Cost for one metre
10,585.48
SAY
₹10,585.50
D-02/SOURCEPRINTED PAGE 1725
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1725

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1725. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSDRAINAGE
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.