Extra for depth for manholes : Size 120x90 cm

With Sewer bricks conforming to IS : 4885
Item number
19.8.2.2
Analysis basis
one metre
Priced inputs
2
Derived rate
₹10,381.45/ ONE METRE
D-01/RATE ANALYSISITEM 19.8.2.2

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 19.8.2.2 (Extra for depth for manholes : Size 120x90 cm With Sewer bricks conforming to IS : 4885) is derived from 2 priced inputs for one metre and works out to ₹10,381.45 per one metre after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • Brick work with modular extruded brunt
  • fly ash clay sewer bricks conforming to IS
  • :4885 in cement mortar 1:4 (1 cement: 4
  • coarse sand )
  • 5.12x0.23x1.0 m = 1.178 cum Say 1.18 cum
  • 12 mm cement plaster 1:3 (1 cement : 3
  • coarse sand) finished with floating coat of
  • neat cement
  • 4.20x1 m = 4.20 sqm
ANALYSIS OF RATES · ITEM 19.8.2.2DETAILS OF COST FOR ONE METRE
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
SUBRate as per item No 6.36.1 of SH : Brick WorkRate as per item 6.36.1cum1.187,197.758,493.35
SUBRate as per item no 13.9.1 of SH : FinishingRate as per item 13.9.1sqm4.2449.551,888.11
BUILD-UP TO RATE
TOTAL
10,381.46
Cost for one metre
10,381.46
SAY
₹10,381.45
D-02/SOURCEPRINTED PAGE 1725
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1725

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1725. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.