Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete

700 mm dia. R.C.C. pipe

Item number
19.6.8
Analysis basis
Details of cost for 10 metre
Priced inputs
8
Derived rate
2,932.50 / metre

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 19.6.8 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 700 mm dia. R.C.C. pipe — is derived from 8 priced inputs for 10 metre and works out to ₹2,932.50 per metre after water charges, GST, CPOH and cess. The full build-up is below.

  • (in 2.5 m. length = 4 Nos.)
  • 4 Nos.
  • Cement of 4 joints = 4x0.0062 = 0.0248
  • cum = 0.037 tonne
  • Fine sand for 4 joints = 0.0124x4 =
  • 0.0496 cum = 0.05 cum
CodeInputUnitQuantityRate (INR)Amount (INR)
1707R.C.C. pipes NP2 class 700 mm diaMaterialmetre101,605.0016,050.00
1721R.C.C. collars NP2 class 700 mm diaMaterialeach4175.00700.00
0367Portland Cement (OPC-43 grade)Materialtonne0.0375,156.00190.77
0983Fine sand (zone IV)Materialcum0.05980.0049.00
0123Mason 1st classMason 1st classLabourday1.03897.00923.91
0124Mason 2nd classMason 2nd classLabourday1.03816.00840.48
0114BeldarLabourday2.06736.001,516.16
0101BhistiLabourday0.42816.00342.72
TOTAL
20,613.04
Add 1 % Water charges on “W”
206.13
TOTAL
20,819.17
Add GST on “X” (multiplying factor 0.2127)
4,428.24
TOTAL
25,247.41
Add 15% CPOH on “Y”
3,787.11
TOTAL
29,034.52
Add Cess @ 1% on “Z”
290.35
Cost of 10 metre
29,324.87
Cost of 1 metre
2,932.49
Say
2,932.50

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1711. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.