Skip to main content

CPWD Analysis of Rates · Drainage

Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete

150 mm dia. R.C.C. pipe

Item number
19.6.2
Analysis basis
Details of cost for 10 metre
Priced inputs
8
Derived rate
556.45 / metre

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 19.6.2 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 150 mm dia. R.C.C. pipe — is derived from 8 priced inputs for 10 metre and works out to ₹556.45 per metre after water charges, GST, CPOH and cess. The full build-up is below.

  • (in 2 m. length = 5 Nos.)
  • 5 Nos.
  • Cement of 5 joints = 5x0.0008 = 0.004
  • cum = 0.006 tonne
  • Fine sand for 5 joint = 0.0016x5 = 0.008 cum
CodeInputUnitQuantityRate (INR)Amount (INR)
1701R.C.C. pipes NP2 class 150 mm diaMaterialmetre10230.002,300.00
1715R.C.C. collars NP2 class 150 mm diaMaterialeach540.00200.00
0367Portland Cement (OPC-43 grade)Materialtonne0.0065,156.0030.94
0983Fine sand (zone IV)Materialcum0.008980.007.84
0123Mason 1st classMason 1st classLabourday0.39897.00349.83
0124Mason 2nd classMason 2nd classLabourday0.39816.00318.24
0114BeldarLabourday0.78736.00574.08
0101BhistiLabourday0.16816.00130.56
TOTAL
3,911.49
Add 1 % Water charges on “W”
39.11
TOTAL
3,950.60
Add GST on “X” (multiplying factor 0.2127)
840.29
TOTAL
4,790.89
Add 15% CPOH on “Y”
718.63
TOTAL
5,509.52
Add Cess @ 1% on “Z”
55.10
Cost of 10 metre
5,564.62
Cost of 1 metre
556.46
Say
556.45

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1708. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works