R/DAR 2023

Providing and fixing S.W. intercepting trap in manholes with stiff mixture of cement mortar 1:1 (1 cement : 1 fine sand) including testing of joints etc. complete

150 mm dia
Item number
19.34.2
Analysis basis
Details of cost of 10 nos.
Priced inputs
9
Derived rate
₹602.65
D-01/RATE ANALYSISITEM 19.34.2

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 19.34.2 (Providing and fixing S.W. intercepting trap in manholes with stiff mixture of cement mortar 1:1 (1 cement : 1 fine sand) including testing of joints etc. complete : 150 mm dia) is derived from 9 priced inputs and works out to ₹602.65 after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 19.34.2DETAILS OF COST OF 10 NOS
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
7129MATS.W. intercepting trap 150 mm diaeach10262.002,620.00
9977MATCarriage of trapL.S.20.82.2747.22
0367MATPortland Cement (OPC-43 grade)tonne0.0195,156.0097.96
0983MATFine sand (zone IV)cum0.014980.0013.72
1881MATSpun yarnkilogram1.861.00109.80
0123LABMason 1st classMason 1st classday0.3897.00269.10
0124LABMason 2nd classMason 2nd classday0.3816.00244.80
0114LABBeldarday0.8736.00588.80
0101LABBhistiday0.3816.00244.80
BUILD-UP TO RATE
TOTAL
4,236.20
Add 1 % Water charges on “W”
+42.36
TOTAL
4,278.56
Add GST on “X” (multiplying factor 0.2127)
+910.05
TOTAL
5,188.61
Add 15% CPOH on “Y”
+778.29
TOTAL
5,966.90
Add Cess @ 1% on “Z”
+59.67
Cost of 10 nos.
6,026.57
Cost of one no.
602.66
SAY
₹602.65
D-02/SOURCEPRINTED PAGE 1776
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1776

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1776. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.