Supplying and fixing C.I. cover 300x300 mm without frame for gully trap (standard pattern) the weight of cover to be not less than 4.5 kg

Item number
19.20
Analysis basis
one cover
Priced inputs
3
Derived rate
₹787.00/ ONE COVER
D-01/RATE ANALYSISITEM 19.20

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 19.20 (Supplying and fixing C.I. cover 300x300 mm without frame for gully trap (standard pattern) the weight of cover to be not less than 4.5 kg) is derived from 3 priced inputs for one cover and works out to ₹787.00 per one cover after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 19.20DETAILS OF COST FOR ONE COVER
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
1353MATC.I.cover without frame 300x300mm inside i.e.cover of 4.50 kgC.I. cover without frame 300x300 mm inside weight not less than 4.50 kgeach1525.00525.00
9988MATCarriage for coverL.S.2.72.276.13
0114LABBeldarday0.03736.0022.08
BUILD-UP TO RATE
TOTAL
553.21
Add 1 % Water charges on “W”
+5.53
TOTAL
558.74
Add GST on “X-A” (multiplying factor 0.2127)
+118.84
TOTAL
677.58
Add 15% CPOH on “Y”
+101.64
TOTAL
779.22
Add Cess @ 1% on “Z”
+7.79
Cost for 1 cover
787.01
SAY
₹787.00
D-02/SOURCEPRINTED PAGE 1747
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1747

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1747. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSDRAINAGE
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.