Supplying and fixing C.I. cover 300x300 mm without frame for gully trap (standard pattern) the weight of cover to be not less than 4.5 kg
- Item number
- 19.20
- Analysis basis
- one cover
- Priced inputs
- 3
- Derived rate
- ₹787.00/ ONE COVER
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 19.20 (Supplying and fixing C.I. cover 300x300 mm without frame for gully trap (standard pattern) the weight of cover to be not less than 4.5 kg) is derived from 3 priced inputs for one cover and works out to ₹787.00 per one cover after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 1353 | MAT | C.I.cover without frame 300x300mm inside i.e.cover of 4.50 kgC.I. cover without frame 300x300 mm inside weight not less than 4.50 kg | each | 1 | 525.00 | 525.00 |
| 9988 | MAT | Carriage for cover | L.S. | 2.7 | 2.27 | 6.13 |
| 0114 | LAB | Beldar | day | 0.03 | 736.00 | 22.08 |
- TOTAL
- 553.21
- Add 1 % Water charges on “W”
- +5.53
- TOTAL
- 558.74
- Add GST on “X-A” (multiplying factor 0.2127)
- +118.84
- TOTAL
- 677.58
- Add 15% CPOH on “Y”
- +101.64
- TOTAL
- 779.22
- Add Cess @ 1% on “Z”
- +7.79
- Cost for 1 cover
- 787.01
- SAY
- ₹787.00
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1747
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1747. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.