CPWD Analysis of Rates · Drainage
Supplying and fixing C.I. cover without frame for manholes
500 mm diameter C.I. cover (medium duty) the weight of the cover to be not less than 58 kg
- Item number
- 19.18.2
- Analysis basis
- Details of cost for one cover
- Priced inputs
- 3
- Derived rate
- ₹3,441.20 / one cover
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 19.18.2 — Supplying and fixing C.I. cover without frame for manholes : 500 mm diameter C.I. cover (medium duty) the weight of the cover to be not less than 58 kg — is derived from 3 priced inputs for one cover and works out to ₹3,441.20 per one cover after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 1357 | 500 mm dia cover without frame (medium duty)C.I. 500 mm dia cover without frame (medium duty)Material | each | 1 | 2,300.00 | 2,300.00 |
| 9977 | Carriage of C.I. coverMaterial | L.S. | 13.47 | 2.27 | 30.58 |
| 0114 | BeldarLabour | day | 0.12 | 736.00 | 88.32 |
- TOTAL
- 2,418.90
- Add 1 % Water charges on “W”
- 24.19
- TOTAL
- 2,443.09
- Add GST on “X-A” (multiplying factor 0.2127)
- 519.65
- TOTAL
- 2,962.74
- Add 15% CPOH on “Y”
- 444.41
- TOTAL
- 3,407.15
- Add Cess @ 1% on “Z”
- 34.07
- Cost for 1 no.
- 3,441.22
- Say
- 3,441.20
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1742. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works