CPWD Analysis of Rates · Drainage

Replacement of M.S. foot rests in manholes including dismantling concrete blocks and fixing with 20x20x10 cm cement concrete blocks 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

With 20 mm diameter round bar

Item number
19.17.2
Analysis basis
Details of cost for one M.S foot rests
Priced inputs
8
Derived rate
621.95 / one M

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 19.17.2 Replacement of M.S. foot rests in manholes including dismantling concrete blocks and fixing with 20x20x10 cm cement concrete blocks 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size): With 20 mm diameter round bar — is derived from 8 priced inputs for one M and works out to ₹621.95 per one m after water charges, GST, CPOH and cess. The full build-up is below.

  • M.S. roumd bars 20 mm dia 0.75 m @
  • 2.47 kg/m =0.018 q
  • Labour for fabrication
  • Cement concrete 1:3:6 ( 1 cement : 3
  • coarse sand : 6 graded stone aggregate
  • 20 mm nominal size)
  • 0.20x0.20x0.10 m = 0.004 cum
  • for dismantling old forts rest cutting holes
  • and fixing new M.S. foot rests
CodeInputUnitQuantityRate (INR)Amount (INR)
1003Mild steel round bar above 12 mm diaMaterialquintal0.0185,450.0098.10
9988Carriage,painting, and other sundriesMaterialL.S.1.822.274.13
0103Blacksmith 2nd classLabourday0.1816.0081.60
0114BeldarLabourday0.1736.0073.60
Rate as per item no 4.1.5 of SH : Concrete workRate as per item 4.1.5Sub-analysiscum0.0047,294.7029.18
0123Mason 1st classMason 1st classLabourday0.05897.0044.85
0124Mason 2nd classMason 2nd classLabourday0.05816.0040.80
0114BeldarLabourday0.1736.0073.60
TOTAL
445.86
Add 1 % Water charges on “W-A”
4.17
TOTAL
450.03
Add GST on “X-A” (multiplying factor 0.2127)
89.51
TOTAL
539.54
Add 15% CPOH on “Y-A”
76.55
TOTAL
616.09
Add Cess @ 1% on “Z-A”
5.87
Cost for 1 no.
621.96
Say
621.95

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1741. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.