Skip to main content

CPWD Analysis of Rates · Drainage

Replacement of M.S. foot rests in manholes including dismantling concrete blocks and fixing with 20x20x10 cm cement concrete blocks 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

With 20x20 mm square bar

Item number
19.17.1
Analysis basis
Details of cost for one M.S foot rests
Priced inputs
8
Derived rate
670.20 / one M

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 19.17.1 Replacement of M.S. foot rests in manholes including dismantling concrete blocks and fixing with 20x20x10 cm cement concrete blocks 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size): With 20x20 mm square bar — is derived from 8 priced inputs for one M and works out to ₹670.20 per one m after water charges, GST, CPOH and cess. The full build-up is below.

  • M.S. 20 mm square bar 0.75 m @ 3.137
  • kg/m =0.024 q
  • Labour for fabrication
  • Cement concrete 1:3:6 ( 1 cement : 3
  • coarse sand : 6 graded stone aggregate
  • 20 mm nominal size)
  • 0.20x0.20x0.10 m = 0.004 cum
  • for dismantling old forts rest cutting holes
  • and fixing new M.S. foot rests
CodeInputUnitQuantityRate (INR)Amount (INR)
1006Mild steel square barsMaterialquintal0.0245,500.00132.00
9988Carriage,painting, and other sundriesMaterialL.S.1.822.274.13
0103Blacksmith 2nd classLabourday0.1816.0081.60
0114BeldarLabourday0.1736.0073.60
Rate as per item no 4.1.5 of SH : Concrete workRate as per item 4.1.5Sub-analysiscum0.0047,294.7029.18
0123Mason 1st classMason 1st classLabourday0.05897.0044.85
0124Mason 2nd classMason 2nd classLabourday0.05816.0040.80
0114BeldarLabourday0.1736.0073.60
TOTAL
479.76
Add 1 % Water charges on “W-A”
4.51
TOTAL
484.27
Add GST on “X-A” (multiplying factor 0.2127)
96.80
TOTAL
581.07
Add 15% CPOH on “Y-A”
82.78
TOTAL
663.85
Add Cess @ 1% on “Z-A”
6.35
Cost for 1 no.
670.20
Say
670.20

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1740. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works