Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge
- Item number
- 15.9.2
- Analysis basis
- 1 cum
- Priced inputs
- 3
- Derived rate
- ₹2,458.95/ CUM
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.9.2 (Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In cement mortar) is derived from 3 priced inputs for 1 cum and works out to ₹2,458.95 per cum after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 0114 | LAB | Beldar | day | 1.3 | 736.00 | 956.80 |
| 0115 | LAB | Coolie | day | 1.04 | 736.00 | 765.44 |
| 9999 | MAT | Sundries | L.S. | 2.73 | 2.27 | 6.20 |
- TOTAL
- 1,728.44
- Add 1 % Water charges on “W”
- +17.28
- TOTAL
- 1,745.72
- Add GST on “X” (multiplying factor 0.2127)
- +371.31
- TOTAL
- 2,117.03
- Add 15% CPOH on “Y”
- +317.55
- TOTAL
- 2,434.58
- Add Cess @ 1% on “Z”
- +24.35
- Cost of 1.00 cum
- 2,458.93
- SAY
- ₹2,458.95
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1105
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1105. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.