CPWD Analysis of Rates · Dismantling and Demolishing
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved
- Item number
- 15.60
- Analysis basis
- Details of cost for 1 cum
- Priced inputs
- 1
- Derived rate
- ₹263.95 / cum
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.60 — Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved — is derived from 1 priced inputs for 1 cum and works out to ₹263.95 per cum after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 2264 | Carriage of RubbishMaterial | cum | 1 | 185.55 | 185.55 |
- TOTAL
- 185.55
- Add 1 % Water charges on “W”
- 1.86
- TOTAL
- 187.41
- Add GST on “X” (multiplying factor 0.2127)
- 39.86
- TOTAL
- 227.27
- Add 15% CPOH on “Y”
- 34.09
- TOTAL
- 261.36
- Add Cess @ 1% on “Z”
- 2.61
- Cost of 1 cum
- 263.97
- Say
- 263.95
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1142. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.