Taking out C.I. cover with frame from R.C.C. top slab of inspection chambers of various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-charge
- Item number
- 15.49
- Analysis basis
- 1 man
- Priced inputs
- 4
- Derived rate
- ₹406.75/ MAN
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 15.49 (Taking out C.I. cover with frame from R.C.C. top slab of inspection chambers of various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-charge) is derived from 4 priced inputs for 1 man and works out to ₹406.75 per man after water charges, GST, CPOH and cess. The full build-up is below.
- Demolition of R.C.C. slab
- 1.1x0.9x0.15 m =0.148cum
- =0.106cum Say 0.11cum
- Less cover 0.61x0.455x0.15 m =0.042cum
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 0114 | LAB | Beldar | day | 0.29 | 736.00 | 213.44 |
| 0115 | LAB | Coolie | day | 0.08 | 736.00 | 58.88 |
| 9999 | MAT | Removel of C.I. Cover with frame including stacking | L.S. | 0.65 | 2.27 | 1.48 |
| 9999 | MAT | Sundries | L.S. | 5.33 | 2.27 | 12.10 |
- TOTAL
- 285.90
- Add 1 % Water charges on “W”
- +2.86
- TOTAL
- 288.76
- Add GST on “X” (multiplying factor 0.2127)
- +61.42
- TOTAL
- 350.18
- Add 15% CPOH on “Y”
- +52.53
- TOTAL
- 402.71
- Add Cess @ 1% on “Z”
- +4.03
- Cost of each
- 406.74
- SAY
- ₹406.75
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1133
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1133. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.