CPWD Analysis of Rates · Cladding Work
Providing and fixing 4mm thick coir veneer board, ISI marked IS : 14842, plain lining with necessary screws, priming coat on unexposed surface etc., complete
- Item number
- 8.29
- Analysis basis
- Details of cost for 10sqm.
- Priced inputs
- 8
- Derived rate
- ₹1,825.05 / sqm
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 8.29 — Providing and fixing 4mm thick coir veneer board, ISI marked IS : 14842, plain lining with necessary screws, priming coat on unexposed surface etc., complete — is derived from 8 priced inputs and works out to ₹1,825.05 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
- Coir veneered board 4mm thick = 10sqm.
- Total = 12 sqm.
- Second class teak wood plugs including cutting
- brick work and fixing in cement mortar 1:3 (1
- cement: 3 fine sand)
- Priming coat Painting with ready mixed priming
- coat
- Add for wastage @ 20% = 2 sqm.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 7552 | Coir veneered board 4mm thickCoir veneered board 4 mm thickMaterial | sqm | 12 | 274.00 | 3,288.00 |
| 9977 | Carriage of Coir veneered boardMaterial | L.S. | 5.46 | 2.27 | 12.39 |
| Rate as per item no 8.23 of SH : Cladding WorkRate as per item 8.23Sub-analysis | each | 55 | 40.85 | 2,246.75 | |
| 0111 | Carpenter 1st classLabour | day | 3.8 | 897.00 | 3,408.60 |
| 0114 | BeldarLabour | day | 4.6 | 736.00 | 3,385.60 |
| 0130 | MistryLabour | day | 0.6 | 897.00 | 538.20 |
| 9999 | 20mm nails without head for fixing plyMaterial | L.S. | 53.82 | 2.27 | 122.17 |
| Rate as per item no 13.85.1 of SH : FinishingRate as per item 13.85.1Sub-analysis | sqm | 10 | 70.35 | 703.50 |
- TOTAL
- 13,705.21
- Add 1 % Water charges on “W-A”
- 107.55
- TOTAL
- 13,812.76
- Add GST on “X-A” (multiplying factor 0.2127)
- 2,310.46
- TOTAL
- 16,123.22
- Add 15% CPOH on “Y-A”
- 1,975.95
- TOTAL
- 18,099.17
- Add Cess @ 1% on “Z-A”
- 151.49
- Cost of 10 sqm.
- 18,250.66
- Cost of 1 sqm.
- 1,825.07
- Say
- 1,825.05
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 428. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.