Skip to main content

CPWD Analysis of Rates · Cladding Work

Providing and fixing in wall lining flat pressed three layer (medium density) particle board or graded wood Pre-laminated one side decorative lamination and other side balancing lamination Grade I, Type II, IS : 12823 marked, including priming coat on unexposed arrangement and screws etc. complete

12 mm thick

Item number
8.26.1
Analysis basis
Details of cost for 10 sqm.
Priced inputs
7
Derived rate
1,430.20 / sqm

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 8.26.1 Providing and fixing in wall lining flat pressed three layer (medium density) particle board or graded wood Pre-laminated one side decorative lamination and other side balancing lamination Grade I, Type II, IS : 12823 marked, including priming coat on unexposed arrangement and screws etc. complete : 12 mm thick — is derived from 7 priced inputs for 10 sqm and works out to ₹1,430.20 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

  • Particle board (three layer medium density)
  • 12mm thick = 10 sqm.
  • Total = 11 sqm.
  • Priming coat
  • Add wastage @ 10% = 1 sqm.
CodeInputUnitQuantityRate (INR)Amount (INR)
7477Prelaminated particle board with one side decorative and other side balancing lamination, flat pressed 3 layer & graded (medium density) Grade I, Type II conforming to IS : 12823 (exterior grade) 12 mm thickPrelaminated particle board with one side decorative and other side balancing lamination, flat pressed 3 layer & graded (medium density) Grade-I, Type II conforming to IS : 12823 (exterior grade) 12 mm thickMaterialsqm11550.006,050.00
9977Carriage of particle boardMaterialL.S.13.522.2730.69
9999Sundries and screwsMaterialL.S.26.912.2761.09
Rate as per item no 13.85.1 of SH : FinishingRate as per item 13.85.1Sub-analysissqm1070.35703.50
0112Carpenter 2nd classLabourday1.28816.001,044.48
0114BeldarLabourday1.43736.001,052.48
7048Rawl plug 50 mm (designation 10 no.)Rawl plug 50 mm (designation 10)Materialeach5524.001,320.00
TOTAL
10,262.24
Add 1 % Water charges on “W-A”
95.59
TOTAL
10,357.83
Add GST on “X-A” (multiplying factor 0.2127)
2,053.48
TOTAL
12,411.31
Add 15% CPOH on “Y-A”
1,756.17
TOTAL
14,167.48
Add Cess @ 1% on “Z-A”
134.64
Cost of 10 sqm.
14,302.12
Cost of 1 sqm.
1,430.21
Say
1,430.20

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 424. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works