CPWD Analysis of Rates · Cladding Work

Providing and fixing 2nd class teak wood plain lining tongued and grooved, including wooden plugs complete with necessary screws and priming coat on unexposed surface

12 mm thick

Item number
8.25.4
Analysis basis
Details of cost of 10 sqm
Priced inputs
8
Derived rate
2,423.25 / sqm

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 8.25.4 Providing and fixing 2nd class teak wood plain lining tongued and grooved, including wooden plugs complete with necessary screws and priming coat on unexposed surface 12 mm thick — is derived from 8 priced inputs and works out to ₹2,423.25 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

  • WoodSecond class teak wood 10x0.012 = 0.12 cum+
  • Total = 0.132 cum. Say 132 cudm.
  • Priming coat
  • Add wastage @ 10% = 0.012 cum.
CodeInputUnitQuantityRate (INR)Amount (INR)
1190Second class teak wood in planksMaterialcudm13.2791.0010,441.20
1231Extra for selected planks of second class teakwoodMaterialcudm13.2150.001,980.00
Rate as per item no 8.23 of SH : Cladding WorkRate as per item 8.23Sub-analysiseach5540.852,246.75
0111Carpenter 1st classLabourday1.08897.00968.76
0112Carpenter 2nd classLabourday0.8816.00652.80
0114BeldarLabourday1.08736.00794.88
Rate as per item no 13.85.1 of SH : FinishingRate as per item 13.85.1Sub-analysissqm1070.35703.50
9999Sundries & screws etc.MaterialL.S.53.822.27122.17
TOTAL
17,910.06
Add 1 % Water charges on “W-A”
149.60
TOTAL
18,059.66
Add GST on “X-A” (multiplying factor 0.2127)
3,213.77
TOTAL
21,273.43
Add 15% CPOH on “Y-A”
2,748.48
TOTAL
24,021.91
Add Cess @ 1% on “Z-A”
210.72
Cost of 10 sqm.
24,232.63
Cost of 1 sqm.
2,423.26
Say
2,423.25

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 424. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.