CPWD Analysis of Rates · Cladding Work

Providing and fixing 2nd class teak wood plain lining tongued and grooved, including wooden plugs complete with necessary screws and priming coat on unexposed surface

25 mm thick

Item number
8.25.2
Analysis basis
Details of cost of 10 sqm
Priced inputs
7
Derived rate
4,437.80 / sqm

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 8.25.2 Providing and fixing 2nd class teak wood plain lining tongued and grooved, including wooden plugs complete with necessary screws and priming coat on unexposed surface 25 mm thick — is derived from 7 priced inputs and works out to ₹4,437.80 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

  • Teak wood 2nd class 10x0.25 = 0.25cum+
  • Total = 0.275 cum. Say 275 cudm.
  • Priming coat
  • Add wastage @ 10% = 0.025 cum.
CodeInputUnitQuantityRate (INR)Amount (INR)
1190Second class teak wood in planksMaterialcudm27.5791.0021,752.50
1231Extra for selected planks of second class teakwoodMaterialcudm27.5150.004,125.00
Rate as per item no 8.23 of SH : Cladding WorkRate as per item 8.23Sub-analysiseach5540.852,246.75
Rate as per item no 13.85.1 of SH : FinishingRate as per item 13.85.1Sub-analysissqm1070.35703.50
0111Carpenter 1st classLabourday2.15897.001,928.55
0114BeldarLabourday1.62736.001,192.32
9999Sundries & screws etc.MaterialL.S.53.822.27122.17
TOTAL
32,070.79
Add 1 % Water charges on “W-A”
291.21
TOTAL
32,362.00
Add GST on “X-A” (multiplying factor 0.2127)
6,255.88
TOTAL
38,617.88
Add 15% CPOH on “Y-A”
5,350.14
TOTAL
43,968.02
Add Cess @ 1% on “Z-A”
410.18
Cost of 10 sqm.
44,378.20
Cost of 1 sqm.
4,437.82
Say
4,437.80

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 423. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.