CPWD Analysis of Rates · Cladding Work
Providing and fixing copper pins 7.5 cm long 6 mm diameter for securing adjacent stones in stone wall lining in cement mortar 1:2 (1 cement : 2 coarse sand), including making the necessary chases
- Item number
- 8.16
- Analysis basis
- Details of cost for one copper pin
- Priced inputs
- 4
- Derived rate
- ₹43.90 / one copper
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 8.16 — Providing and fixing copper pins 7.5 cm long 6 mm diameter for securing adjacent stones in stone wall lining in cement mortar 1:2 (1 cement : 2 coarse sand), including making the necessary chases — is derived from 4 priced inputs for one copper and works out to ₹43.90 per one copper after water charges, GST, CPOH and cess. The full build-up is below.
- Cement mortar 1:2 (1 cement : 2 coarse sand)
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 0873 | Copper pins 6 mm dia 7.5 cm longMaterial | each | 1 | 12.00 | 12.00 |
| 9999 | Labour for making pin in to required shape and size, cutting chases in stone and fixing in positionMaterial | L.S. | 3.9 | 2.27 | 8.85 |
| Rate as per Item Number 3.7 of SH: MortarsRate as per item 3.7Sub-analysis | cum | 0.001 | 5,584.50 | 5.58 | |
| 9999 | Sundries including hire charges of hand cut machine etcMaterial | L.S. | 1.95 | 2.27 | 4.43 |
- TOTAL
- 30.86
- Add 1 % Water charges on “W”
- 0.31
- TOTAL
- 31.17
- Add GST on “X” (multiplying factor 0.2127)
- 6.63
- TOTAL
- 37.80
- Add 15% CPOH on “Y”
- 5.67
- TOTAL
- 43.47
- Add Cess @ 1% on “Z”
- 0.43
- Cost of one copper pin
- 43.90
- Say
- 43.90
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 414. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.