CPWD Analysis of Rates · Cladding Work
Providing and fixing stone slab with table rubbed, edges rounded and polished, of size 75x50 cm deep and 1.8 cm thick, fixed in urinal partitions by cutting a chase of appropriate width with chase cutter and embedding the stone in the chase with epoxy grout or with cement concrete
Granite Stone of approved shade
- Item number
- 8.10.2
- Analysis basis
- Details of cost for one No or 0.375sqm.
- Priced inputs
- 4
- Derived rate
- ₹4,051.85 / sqm
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 8.10.2 — Providing and fixing stone slab with table rubbed, edges rounded and polished, of size 75x50 cm deep and 1.8 cm thick, fixed in urinal partitions by cutting a chase of appropriate width with chase cutter and embedding the stone in the chase with epoxy grout or with cement concrete Granite Stone of approved shade — is derived from 4 priced inputs for one No and works out to ₹4,051.85 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
- Granite Stone 1x0.75x0.50 = 0.375sqm.+Add
- wastage 20% = 0.075 sqm. Total = 0.45 sqm.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 7245 | Table rubbed polished stone 18mm thick (75x50cm) Granite stone - 18mm thickTable rubbed polished stone 18 mm thick (75x50cm) Granite stone-18 mm thickMaterial | sqm | 0.45 | 1,938.00 | 872.10 |
| 9999 | Cement concrete 1:2:4 for fixingMaterial | L.S. | 21.58 | 2.27 | 48.99 |
| 9999 | Labour for fixing, edge rounding and final polishingMaterial | L.S. | 43.16 | 2.27 | 97.97 |
| 9999 | SundriesMaterial | L.S. | 21.58 | 2.27 | 48.99 |
- TOTAL
- 1,068.05
- Add 1 % Water charges on “W”
- 10.68
- TOTAL
- 1,078.73
- Add GST on “X” (multiplying factor 0.2127)
- 229.45
- TOTAL
- 1,308.18
- Add 15% CPOH on “Y”
- 196.23
- TOTAL
- 1,504.41
- Add Cess @ 1% on “Z”
- 15.04
- Cost of 0.375 sqm
- 1,519.45
- Cost of 1.00 sqm
- 4,051.87
- Say
- 4,051.85
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 395. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.