Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete (Copper oxidised as per IS 1378)
- Item number
- 9.66.2
- Analysis basis
- 10 nos
- Priced inputs
- 4
- Derived rate
- ₹32.55/ NO
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.66.2 (Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete (Copper oxidised as per IS 1378) 100 mm) is derived from 4 priced inputs for 10 nos and works out to ₹32.55 per no after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 0669 | MAT | Oxidised mild steel handles 100 mm | each | 10 | 16.00 | 160.00 |
| 0685 | MAT | Oxidised mild steel screws 25 mm | 100 Nos | 0.4 | 39.00 | 15.60 |
| 9977 | MAT | Carriage of materials | L.S. | 1.82 | 2.27 | 4.13 |
| 0112 | LAB | Carpenter 2nd class | day | 0.06 | 816.00 | 48.96 |
- TOTAL
- 228.69
- Add 1 % Water charges on “W”
- +2.29
- TOTAL
- 230.98
- Add GST on “X” (multiplying factor 0.2127)
- +49.13
- TOTAL
- 280.11
- Add 15% CPOH on “Y”
- +42.02
- TOTAL
- 322.13
- Add Cess @ 1% on “Z”
- +3.22
- Cost of 10 nos.
- 325.35
- Cost of 1 no.
- 32.54
- SAY
- ₹32.55
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 527
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 527. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.