CPWD Analysis of Rates · Wood and PVC Work
Providing and fixing ISI marked IS:1341 M.S. pressed butt hinges bright finished with necessary screws etc. complete
100x58x1.90 mm
- Item number
- 9.55.2
- Analysis basis
- Details of cost for ten hinges
- Priced inputs
- 5
- Derived rate
- ₹45.00 / no
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.55.2 — Providing and fixing ISI marked IS:1341 M.S. pressed butt hinges bright finished with necessary screws etc. complete : 100x58x1.90 mm — is derived from 5 priced inputs for ten hinges and works out to ₹45.00 per no after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 0595 | Bright finished or black enamelled ISI marked IS: 1341 mild steel pressed butt hinges 100x58x1.90 mmBright finished or black enameled ISI marked IS:1341 mild steel pressed butt hinges 100x58x 1.90 mmMaterial | 10 Nos | 1 | 80.00 | 80.00 |
| 0637 | Bright finished or black enamelled mild steel screws 40 mmBright finished or black enameled mild steel screws 40 mmMaterial | 100 Nos | 0.8 | 62.00 | 49.60 |
| 9977 | Carriage of materialsMaterial | L.S. | 2.73 | 2.27 | 6.20 |
| 0112 | Carpenter 2nd classLabour | day | 0.14 | 816.00 | 114.24 |
| 0114 | BeldarLabour | day | 0.09 | 736.00 | 66.24 |
- TOTAL
- 316.28
- Add 1 % Water charges on “W”
- 3.16
- TOTAL
- 319.44
- Add GST on “X” (multiplying factor 0.2127)
- 67.94
- TOTAL
- 387.38
- Add 15% CPOH on “Y”
- 58.11
- TOTAL
- 445.49
- Add Cess @ 1% on “Z”
- 4.45
- Cost of 10 nos.
- 449.94
- Cost of 1 no
- 44.99
- Say
- 45.00
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 510. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works