Providing and fixing plain jaffri of 35x10 mm laths placed 35 mm apart (frames to be paid separately), including fixing 50x12 mm beading complete with
- Item number
- 9.41.1
- Analysis basis
- Details of cost of a jaffri 200x110cm = 2.2sqm.
- Priced inputs
- 6
- Derived rate
- ₹2,945.10/ SQM
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.41.1 (Providing and fixing plain jaffri of 35x10 mm laths placed 35 mm apart (frames to be paid separately), including fixing 50x12 mm beading complete with : Second class teak wood) is derived from 6 priced inputs and works out to ₹2,945.10 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
- Teakwood IInd class
- Jaffri 210x120x1.0cm = 0.025cum.+
- Beading 660x5x1.2cm = 0.004cum.
- Total = 0.029 cum.+
- Total = 0.032 cum. Say 32 cudm.
- Add wastage @ 10% = 0.003 cum.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 1190 | MAT | Second class teak wood in planks | 10 cudm | 3.2 | 791.00 | 2,531.20 |
| 0111 | LAB | Carpenter 1st class | day | 0.75 | 897.00 | 672.75 |
| 0112 | LAB | Carpenter 2nd class | day | 1 | 816.00 | 816.00 |
| 0114 | LAB | Beldar | day | 0.5 | 736.00 | 368.00 |
| 0130 | LAB | Mistry | day | 0.1 | 897.00 | 89.70 |
| 9999 | MAT | Sundries | L.S. | 33.8 | 2.27 | 76.73 |
- TOTAL
- 4,554.38
- Add 1 % Water charges on “W”
- +45.54
- TOTAL
- 4,599.92
- Add GST on “X” (multiplying factor 0.2127)
- +978.40
- TOTAL
- 5,578.32
- Add 15% CPOH on “Y”
- +836.75
- TOTAL
- 6,415.07
- Add Cess @ 1% on “Z”
- +64.15
- Cost of 2.2 sqm.
- 6,479.22
- Cost of 1 sqm.
- 2,945.10
- SAY
- ₹2,945.10
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 495
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 495. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.