Providing and fixing stainless steel (SS-304 grade) friction hinges to the side/top hung uPVC windows, of approved quality, with necessary stainless steel screws etc. as per direction of Engineer-in-charge
- Item number
- 9.148.3
- Analysis basis
- 10 Nos
- Priced inputs
- 5
- Derived rate
- ₹459.55/ NO
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 9.148.3 (Providing and fixing stainless steel (SS-304 grade) friction hinges to the side/top hung uPVC windows, of approved quality, with necessary stainless steel screws etc. as per direction of Engineer-in-charge 300 x 19 x 1.9 mm) is derived from 5 priced inputs for 10 Nos and works out to ₹459.55 per no after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 8757 | MAT | Stainless steel friction hinge of size 300 mm x 19 x 1.9 mm for uPVC windowsStainless steel friction hinges (SS-304 grade) size 300 x 19 x 1.9 mm for uPVC window | each | 10 | 299.00 | 2,990.00 |
| 8647 | MAT | Stainless steel screws 30mm x4mm.Stainless steel screws 30 mm x4 mm | 100 Nos | 0.4 | 42.00 | 16.80 |
| 9977 | MAT | Carriage of materials | L.S. | 2.73 | 2.27 | 6.20 |
| 0112 | LAB | Carpenter 2nd class | day | 0.14 | 816.00 | 114.24 |
| 0114 | LAB | Beldar | day | 0.14 | 736.00 | 103.04 |
- TOTAL
- 3,230.28
- Add 1 % Water charges on “W”
- +32.30
- TOTAL
- 3,262.58
- Add GST on “X” (multiplying factor 0.2127)
- +693.95
- TOTAL
- 3,956.53
- Add 15% CPOH on “Y”
- +593.48
- TOTAL
- 4,550.01
- Add Cess @ 1% on “Z”
- +45.50
- Cost of 10 Nos
- 4,595.51
- Cost of 1 No
- 459.55
- SAY
- ₹459.55
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 689
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 689. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.