Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work
- Item number
- 18.9.10
- Analysis basis
- 10 metre
- Priced inputs
- 5
- Derived rate
- ₹6,822.70/ METRE
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.9.10 (Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 150 mm nominal dia Pipes) is derived from 5 priced inputs for 10 metre and works out to ₹6,822.70 per metre after water charges, GST, CPOH and cess. The full build-up is below.
- 30 x P / 100
- Trenching and refilling etc.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 8645 | MAT | Chlorinated Polyvinyl - chloride (CPVC) pipe 150 mm nominal dia | metre | 10 | 3,426.00 | 34,260.00 |
| 0116 | LAB | Fitter (grade 1) | day | 0.58 | 897.00 | 520.26 |
| 0114 | LAB | Beldar | day | 1.54 | 736.00 | 1,133.44 |
| 0114 | LAB | Beldar | day | 1.2 | 736.00 | 883.20 |
| 0115 | LAB | Coolie | day | 1.2 | 736.00 | 883.20 |
- Add 30% for fittings and wastage etc. on (P)
- +10,278.00
- TOTAL
- 47,958.10
- Add 1 % Water charges on “W”
- +479.58
- TOTAL
- 48,437.68
- Add GST on “X” (multiplying factor 0.2127)
- +10,302.69
- TOTAL
- 58,740.37
- Add 15% CPOH on “Y”
- +8,811.06
- TOTAL
- 67,551.43
- Add Cess @ 1% on “Z”
- +675.51
- Cost of 10 metre
- 68,226.94
- Cost of 1 metre
- 6,822.69
- SAY
- ₹6,822.70
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1425
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1425. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.