Providing and laying Double Flanged (Screwed/ Welded) Centrifugally (Spun) Ductile Iron Pipes of Class K - 9 conforming to IS : 8329

350 mm dia Ductile Iron Double Flanged
Item number
18.73.6
Analysis basis
5 metre
Priced inputs
2
Derived rate
₹7,550.45/ METRE
D-01/RATE ANALYSISITEM 18.73.6

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.73.6 (Providing and laying Double Flanged (Screwed/ Welded) Centrifugally (Spun) Ductile Iron Pipes of Class K - 9 conforming to IS : 8329: 350 mm dia Ductile Iron Double Flanged) is derived from 2 priced inputs for 5 metre and works out to ₹7,550.45 per metre after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • 350 mm dia. ductile iron pipes double
  • flanged
  • Weight of 1 m pipes = 91.400 Kg
  • Weight of 5 m pipes 91.400x5 = 457.00
  • Kg
ANALYSIS OF RATES · ITEM 18.73.6DETAILS OF COST FOR 5 METRE
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
7691MATDuctile Iron Pipe Class K-9 flanges and welding 350mm diaDuctile Iron Pipe Class K-9 flanges and welding 350 mm diametre55,075.0025,375.00
SUBRate as per Item Number 18.23 of SH: Water SupplyRate as per item 18.23quintal4.57361.651,652.74
BUILD-UP TO RATE
TOTAL
27,027.74
Add 1 % Water charges on “W-A”
+253.75
TOTAL
27,281.49
Add GST on “X-A” (multiplying factor 0.2127)
+5,451.24
TOTAL
32,732.73
Add 15% CPOH on “Y-A”
+4,662.00
TOTAL
37,394.73
Add Cess @ 1% on “Z-A”
+357.42
Cost of 5 metre
37,752.15
Cost per metre
7,550.43
SAY
₹7,550.45
D-02/SOURCEPRINTED PAGE 1561
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1561

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1561. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.