Skip to main content

CPWD Analysis of Rates · Water Supply

Providing and fixing PPR Unions

PPR Union 75mm

Item number
18.6A.7
Analysis basis
Details of cost for 1 No
Priced inputs
4
Derived rate
1,684.05 / No

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.6A.7 Providing and fixing PPR Unions PPR Union 75mm — is derived from 4 priced inputs for 1 No and works out to ₹1,684.05 per no after water charges, GST, CPOH and cess. The full build-up is below.

  • MATERIAL:
  • LABOUR:
CodeInputUnitQuantityRate (INR)Amount (INR)
8312PPR Union 75mmPPR Union 75 mmMaterialeach11,000.001,000.00
9999Carriage of materials and sundriesMaterialL.S.1.822.274.13
0116Fitter (grade 1)Labourday0.11897.0098.67
0114BeldarLabourday0.11736.0080.96
TOTAL
1,183.76
Add 1 % Water charges on “W”
11.84
TOTAL
1,195.60
Add GST on “X” (multiplying factor 0.2127)
254.30
TOTAL
1,449.90
Add 15% CPOH on “Y”
217.49
TOTAL
1,667.39
Add Cess @ 1% on “Z”
16.67
Cost of 1 No
1,684.06
Say
1,684.05

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1415. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works