Skip to main content
R/DAR 2023

Providing and fixing PPR Unions

PPR Union 40mm
Item number
18.6A.4
Analysis basis
1 No
Priced inputs
4
Derived rate
₹543.10/ NO
D-01/RATE ANALYSISITEM 18.6A.4

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 18.6A.4 (Providing and fixing PPR Unions PPR Union 40mm) is derived from 4 priced inputs for 1 No and works out to ₹543.10 per no after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • MATERIAL:
  • LABOUR:
ANALYSIS OF RATES · ITEM 18.6A.4DETAILS OF COST FOR 1 NO
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
8309MATPPR Union 40mmPPR Union 40 mmeach1198.00198.00
9999MATCarriage of materials and sundriesL.S.1.822.274.13
0116LABFitter (grade 1)day0.11897.0098.67
0114LABBeldarday0.11736.0080.96
BUILD-UP TO RATE
TOTAL
381.76
Add 1 % Water charges on “W”
+3.82
TOTAL
385.58
Add GST on “X” (multiplying factor 0.2127)
+82.01
TOTAL
467.59
Add 15% CPOH on “Y”
+70.14
TOTAL
537.73
Add Cess @ 1% on “Z”
+5.38
Cost of 1 No
543.11
SAY
₹543.10
D-02/SOURCEPRINTED PAGE 1414
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1414

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1414. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSWATER SUPPLY
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.