CPWD Analysis of Rates · Stone Work

Providing and fixing horizontal chajja of stone 40 mm thick and upto 80 cm projection in cement mortar 1:4 (1 cement : 4 coarse sand), including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade

Red sand stone

Item number
7.29.1
Analysis basis
Details of cost for (2.5x0.75m) 1.875
Priced inputs
8
Derived rate
1,833.25 / sqm

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 7.29.1 Providing and fixing horizontal chajja of stone 40 mm thick and upto 80 cm projection in cement mortar 1:4 (1 cement : 4 coarse sand), including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : Red sand stone — is derived from 8 priced inputs and works out to ₹1,833.25 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

  • sqm.
  • Taking 2.5mx75cm projection + 15cm
  • bearing = 2.5x0.9 = 2.25 sqm.
CodeInputUnitQuantityRate (INR)Amount (INR)
1164Red sand stone slab 40 mmthick (undressed)Red sand stone slab 40 mm thick (un-dressed)Materialsqm2.25330.00742.50
0125Mason (for plain stone work) 2nd class)Mason (for plain stone work) 2nd classLabourday0.45816.00367.20
9999Mortar for pointing 1:2MaterialL.S.53.822.27122.17
9999PigmentMaterialL.S.6.242.2714.16
9999Extra cost of white cementMaterialL.S.26.912.2761.09
0125Mason (for plain stone work) 2nd class)Mason (for plain stone work) 2nd classLabourday0.6816.00489.60
0114BeldarLabourday0.8736.00588.80
9999Scaffolding and sundries etc.MaterialL.S.13.522.2730.69
TOTAL
2,416.21
Add 1 % Water charges on “W”
24.16
TOTAL
2,440.37
Add GST on “X” (multiplying factor 0.2127)
519.07
TOTAL
2,959.44
Add 15% CPOH on “Y”
443.92
TOTAL
3,403.36
Add Cess @ 1% on “Z”
34.03
Cost of 1.875 sqm.
3,437.39
Cost of 1 sqm.
1,833.27
Say
1,833.25

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 372. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.