Providing and fixing PTMT urinal cock of approved quality and colour

15 mm nominal bore, 80 mm long, 42 mm high and 30mm wide with BSP female threads weighing not less than 48 gms
Item number
17.76.1
Analysis basis
1 no
Priced inputs
2
Derived rate
₹175.40/ NO
D-01/RATE ANALYSISITEM 17.76.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 17.76.1 (Providing and fixing PTMT urinal cock of approved quality and colour 15 mm nominal bore, 80 mm long, 42 mm high and 30mm wide with BSP female threads weighing not less than 48 gms) is derived from 2 priced inputs for 1 no and works out to ₹175.40 per no after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 17.76.1DETAILS OF COST FOR 1 NO
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
7858MATP.T.M.T. Urinal cock 15mm diaP.T.M.T. Urinal cock 15 mm diaeach1105.00105.00
9988MATCarriage of materials and fixing chargesL.S.8.062.2718.30
BUILD-UP TO RATE
TOTAL
123.30
Add 1 % Water charges on “W”
+1.23
TOTAL
124.53
Add GST on “X” (multiplying factor 0.2127)
+26.49
TOTAL
151.02
Add 15% CPOH on “Y”
+22.65
TOTAL
173.67
Add Cess @ 1% on “Z”
+1.74
Cost of each
175.41
SAY
₹175.40
D-02/SOURCEPRINTED PAGE 1386
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1386

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1386. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSSANITARY INSTALLATIONS
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.