Painting sand cast iron/ centrifugally cast (spun) iron soil, waste vent pipes and fittings with two coats of synthetic enamel paint of any colour such as chocolate grey, or buff etc. over a coat of primer (of approved quality) for new work
- Item number
- 17.65.1
- Analysis basis
- 10 metres
- Priced inputs
- 3
- Derived rate
- ₹82.80/ METRE
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 17.65.1 (Painting sand cast iron/ centrifugally cast (spun) iron soil, waste vent pipes and fittings with two coats of synthetic enamel paint of any colour such as chocolate grey, or buff etc. over a coat of primer (of approved quality) for new work : 100 mm diameter pipe) is derived from 3 priced inputs for 10 metres and works out to ₹82.80 per metre after water charges, GST, CPOH and cess. The full build-up is below.
- Perimeter = 3.14x110 mm =345.71
- Area 10x0.3457 = 3.46 sqm
- Priming coat
- Painting two coats with paint of any colour
- such as chocolatem grey or buff etc.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| SUB | Rate as per item no 13.50.3 of SH : FinishingRate as per item 13.50.3 | sqm | 3.46 | 67.40 | 233.20 | |
| SUB | Rate as per item no 13.61.1 of SH : FinishingRate as per item 13.61.1 | sqm | 3.46 | 155.90 | 539.41 | |
| 9999 | MAT | Add for delay | L.S. | 17.16 | 2.27 | 38.95 |
- TOTAL
- 811.56
- Add 1 % Water charges on “W-A”
- +0.39
- TOTAL
- 811.95
- Add GST on “X-A” (multiplying factor 0.2127)
- +8.37
- TOTAL
- 820.32
- Add 15% CPOH on “Y-A”
- +7.16
- TOTAL
- 827.48
- Add Cess @ 1% on “Z-A”
- +0.55
- Cost of 10 metres
- 828.03
- Cost of 1 metre
- 82.80
- SAY
- ₹82.80
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1378
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1378. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.