Painting C.I. cistern with bitumastic or any other anti-corrosive paint inside and white paint over a coat of zinc chromate yellow primer (of approved quality ) on the outside surface of the cistern, flush pipe, other fittings, etc. complete for new work
- Item number
- 17.62
- Analysis basis
- one cistern
- Priced inputs
- 7
- Derived rate
- ₹1,020.60/ ONE CISTERN
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 17.62 (Painting C.I. cistern with bitumastic or any other anti-corrosive paint inside and white paint over a coat of zinc chromate yellow primer (of approved quality ) on the outside surface of the cistern, flush pipe, other fittings, etc. complete for new work) is derived from 7 priced inputs for one cistern and works out to ₹1,020.60 per one cistern after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 0828 | MAT | Anticorrosive bituminous paint (black) | litre | 0.23 | 120.00 | 27.60 |
| 4202 | MAT | Red oxide Zinc chromate primer | litre | 0.2 | 140.00 | 28.00 |
| 0834 | MAT | Synthetic enamel paint in all shades except black or chocolate shade | litre | 0.4 | 178.00 | 71.20 |
| 9977 | MAT | Carriage of materials | L.S. | 1.43 | 2.27 | 3.25 |
| 9999 | MAT | Sundries | L.S. | 6.76 | 2.27 | 15.35 |
| 0131 | LAB | Painter | day | 0.25 | 816.00 | 204.00 |
| 0114 | LAB | Beldar | day | 0.5 | 736.00 | 368.00 |
- TOTAL
- 717.40
- Add 1 % Water charges on “W”
- +7.17
- TOTAL
- 724.57
- Add GST on “X” (multiplying factor 0.2127)
- +154.12
- TOTAL
- 878.69
- Add 15% CPOH on “Y”
- +131.80
- TOTAL
- 1,010.49
- Add Cess @ 1% on “Z”
- +10.10
- Cost of each
- 1,020.59
- SAY
- ₹1,020.60
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1376
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1376. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.