Providing and fixing white vitreous china water closet squatting pan (Indian type)
- Item number
- 17.13.1
- Analysis basis
- one no
- Priced inputs
- 5
- Derived rate
- ₹1,959.80/ ONE NO
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 17.13.1 (Providing and fixing white vitreous china water closet squatting pan (Indian type) : Long pattern W.C. pan of size 580 mm) is derived from 5 priced inputs for one no and works out to ₹1,959.80 per one no after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 1953 | MAT | Vitreous china indian type w.c. pan size 580 mmVitreous china Indian type W.C. pan of size 580 mm | each | 1 | 500.00 | 500.00 |
| 9999 | MAT | Cement, sand and grit etc. | L.S. | 13.39 | 2.27 | 30.40 |
| 9977 | MAT | Carriage of materials | L.S. | 13.52 | 2.27 | 30.69 |
| 0123 | LAB | Mason 1st classMason 1st class | day | 0.5 | 897.00 | 448.50 |
| 0114 | LAB | Beldar | day | 0.5 | 736.00 | 368.00 |
- TOTAL
- 1,377.59
- Add 1 % Water charges on “W”
- +13.78
- TOTAL
- 1,391.37
- Add GST on “X” (multiplying factor 0.2127)
- +295.94
- TOTAL
- 1,687.31
- Add 15% CPOH on “Y”
- +253.10
- TOTAL
- 1,940.41
- Add Cess @ 1% on “Z”
- +19.40
- Cost of each
- 1,959.81
- SAY
- ₹1,959.80
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1308
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1308. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.