CPWD Analysis of Rates · Roofing

Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion Single tee without door

110x110x110 mm

Item number
12.42.4.2
Analysis basis
Details of cost for 1 tee
Priced inputs
3
Derived rate
221.35 / tee

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 12.42.4.2 Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion Single tee without door 110x110x110 mm — is derived from 3 priced inputs for 1 tee and works out to ₹221.35 per tee after water charges, GST, CPOH and cess. The full build-up is below.

CodeInputUnitQuantityRate (INR)Amount (INR)
7197UPVC single equal Tee (without door) 110x110x110 mmMaterialeach189.0089.00
7191U-PVC pipes (working pressure 4 kg /sqcm) Rubber (Seal) Ring 110 mm diaU-PVC pipes (working pressure 4 kg / cm²) Rubber (Seal) Ring 110 mm diaMaterialeach312.0036.00
9988Adhesive, Carriage of material rubber washer etc. including fixing chargesMaterialL.S.13.472.2730.58
TOTAL
155.58
Add 1 % Water charges on “W”
1.56
TOTAL
157.14
Add GST on “X” (multiplying factor 0.2127)
33.42
TOTAL
190.56
Add 15% CPOH on “Y”
28.58
TOTAL
219.14
Add Cess @ 1% on “Z”
2.19
Cost of 1 tee
221.33
Say
221.35

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 901. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.