CPWD Analysis of Rates · Roofing
Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion Single tee with door
110x110x110 mm
- Item number
- 12.42.3.2
- Analysis basis
- Details of cost for 1 tee
- Priced inputs
- 3
- Derived rate
- ₹234.15 / tee
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 12.42.3.2 — Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion Single tee with door 110x110x110 mm — is derived from 3 priced inputs for 1 tee and works out to ₹234.15 per tee after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 7199 | UPVC single equal Tee (with door) 110x110x110 mmMaterial | each | 1 | 98.00 | 98.00 |
| 7191 | U-PVC pipes (working pressure 4 kg / sqcm) Rubber (Seal) Ring 110 mm diaU-PVC pipes (working pressure 4 kg / cm²) Rubber (Seal) Ring 110 mm diaMaterial | each | 3 | 12.00 | 36.00 |
| 9988 | Adhesive, Carriage of material rubber washer etc. including fixing chargesMaterial | L.S. | 13.47 | 2.27 | 30.58 |
- TOTAL
- 164.58
- Add 1 % Water charges on “W”
- 1.65
- TOTAL
- 166.23
- Add GST on “X” (multiplying factor 0.2127)
- 35.36
- TOTAL
- 201.59
- Add 15% CPOH on “Y”
- 30.24
- TOTAL
- 231.83
- Add Cess @ 1% on “Z”
- 2.32
- Cost of 1 tee
- 234.15
- Say
- 234.15
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 900. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.