CPWD Analysis of Rates · Road Work

Providing and fixing 10x10x7.50 cm Granite stone block hand cut and chisel dressed on top, for paving in floors, drains etc. laid over 20mm thick base mortar 1:4 (1 cement : 4 coarse sand) with joints 10mm wide filled with same mortar including ruled pointing etc. complete as per direction of engineer-in-charge

Item number
16.92
Analysis basis
Details of cost for 10.00 sqm.
Priced inputs
8
Derived rate
2,189.15 / sqm

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.92 Providing and fixing 10x10x7.50 cm Granite stone block hand cut and chisel dressed on top, for paving in floors, drains etc. laid over 20mm thick base mortar 1:4 (1 cement : 4 coarse sand) with joints 10mm wide filled with same mortar including ruled pointing etc. complete as per direction of engineer-in-charge — is derived from 8 priced inputs for 10.00 sqm and works out to ₹2,189.15 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

  • MATERIALS :
  • Stone size 10x10x7.50cm =1sqm
  • LABOUR :
CodeInputUnitQuantityRate (INR)Amount (INR)
7774Stone size 10x10x7.50cm (including carriage)Stone size 10x10x7.50cm (including carriage)Materialeach82710.008,270.00
Rate as per Item No.3.9 of SH: MORTARSRate as per item 3.9Sub-analysiscum0.4344,211.701,827.88
0367Portland Cement (OPC-43 grade)Materialtonne0.025,156.00103.12
0124Mason 2nd classMason 2nd classLabourday1.08816.00881.28
0114BeldarLabourday0.25736.00184.00
0115CoolieLabourday1.62736.001,192.32
0101BhistiLabourday0.27816.00220.32
Rate as per Item No.13.33.1 of SH: FINISHINGRate as per item 13.33.1Sub-analysissqm10385.403,854.00
TOTAL
16,532.92
Add 1 % Water charges on “W-A”
126.79
TOTAL
16,659.71
Add GST on “X-A” (multiplying factor 0.2127)
2,723.77
TOTAL
19,383.48
Add 15% CPOH on “Y-A”
2,329.42
TOTAL
21,712.90
Add Cess @ 1% on “Z-A”
178.59
Cost of 10 sqm.
21,891.49
Cost of 1 sqm.
2,189.15
Say
2,189.15

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1274. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.