Skip to main content
R/DAR 2023

Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge

With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30
Item number
16.78.1
Analysis basis
225 cum
Priced inputs
15
Derived rate
₹2,784.00/ CUM
D-01/RATE ANALYSISITEM 16.78.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.78.1 (Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30) is derived from 15 priced inputs for 225 cum and works out to ₹2,784.00 per cum after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • Close graded graunlar sub-base material as
  • per Grading-I of specifications
  • 53mm to 9.5mm @ 50% = 144 cum
  • 9.5 mm to 2.36mm @ 20% = 57 cum
  • 2.36mm below @ 30% = 86.40 cum
  • @75 tonne capacity
  • 5 km lead with one trip per hour
  • Tipper 10 tonne capacity( taking lead= 10
  • Km) =450x10 =4500 tonne km
ANALYSIS OF RATES · ITEM 16.78.1DETAILS OF COST FOR 225 CUM (450 TONNES)
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0292MATStone Aggregate (Single size) : 50 mm nominal sizecum721,100.0079,200.00
0297MATStone Aggregate (Single size) : 10 mm nominal sizecum721,400.001,00,800.00
1179MATCrushed stone 2.36 mm to 12.5 mm sizecum571,005.0057,285.00
2903MATStone chippings/ screenings 4.75 mm nominal sizecum43.21,600.0069,120.00
2904MATStone chippings/ screenings 150 micron nominal sizecum43.21,600.0069,120.00
0059MACHWet Mix Plant 60 TPHhour61,050.006,300.00
0070MACHGenerator 100 KVA/125 KVAhour6350.002,100.00
0057MACHWater Tanker 5 to 6 KL capacityhour4.5250.001,125.00
0052MACHFront end loader 1 cum bucket capacity (incl POL)hour61,450.008,700.00
0053MACHTipper -5 CumTipper-5 Cum/10 tonnestonne km4,5003.7016,650.00
0050MACHMotor Grader 3.35 metre bladehour62,700.0016,200.00
0054MACHVibratory roller 8 to 10 tonnehour6700.004,200.00
0128LABMateday0.4816.00326.40
0139LABSkilled Beldar (for floor rubbing etc.)day2816.001,632.00
0114LABBeldarday8736.005,888.00
BUILD-UP TO RATE
Add 10 per cent of cost of carriage to cover cost of loading and unloading
+1,665.00
TOTAL
4,40,311.40
Add 1 % Water charges on “W”
+4,403.11
TOTAL
4,44,714.51
Add GST on “X” (multiplying factor 0.2127)
+94,590.78
TOTAL
5,39,305.29
Add 15% CPOH on “Y”
+80,895.79
TOTAL
6,20,201.08
Add Cess @ 1% on “Z”
+6,202.01
Cost for 225 cum(450 Tonne)
6,26,403.09
Cost per cum.
2,784.01
SAY
₹2,784.00
D-02/SOURCEPRINTED PAGE 1259
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1259

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1259. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSROAD WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.