CPWD Analysis of Rates · Road Work
Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of ail dirt, scales, oil, grease and other foreign material etc. and lining out complete
Old work (One or more coats)
- Item number
- 16.47.2
- Analysis basis
- Details of cost for 10sqm.
- Priced inputs
- 5
- Derived rate
- ₹120.80
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.47.2 — Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of ail dirt, scales, oil, grease and other foreign material etc. and lining out complete Old work (One or more coats) — is derived from 5 priced inputs and works out to ₹120.80 after water charges, GST, CPOH and cess. The full build-up is below.
- (including painting brush, wire brush, labour
- for controlling traffic and other T&P etc.)
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 7256 | Superior quality road marking paint (water based)Material | litre | 1.66 | 140.00 | 232.40 |
| 9977 | Carriage of paintMaterial | L.S. | 1.12 | 2.27 | 2.54 |
| 0131 | PainterLabour | day | 0.36 | 816.00 | 293.76 |
| 0114 | BeldarLabour | day | 0.36 | 736.00 | 264.96 |
| 9999 | SundriesMaterial | L.S. | 24.44 | 2.27 | 55.48 |
- TOTAL
- 849.14
- Add 1 % Water charges on “W”
- 8.49
- TOTAL
- 857.63
- Add GST on “X” (multiplying factor 0.2127)
- 182.42
- TOTAL
- 1,040.05
- Add 15% CPOH on “Y”
- 156.01
- TOTAL
- 1,196.06
- Add Cess @ 1% on “Z”
- 11.96
- Cost for 10 sqm.
- 1,208.02
- Cost per sqm.
- 120.80
- Say
- 120.80
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1212. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.