CPWD Analysis of Rates · Road Work

2.5 cm thick bitumastic sheet with hot bitumen of approved quality, using stone chippings (60% with 12.5 mm nominal size and 40% with 10 mm nominal size) @ 1.65 cum per 100 sqm and coarse sand @ 1.65 cum per 100 sqm of road surface and with bitumen @ 56 kg/cum of stone chippings and @ 128 kg/cum of sand over a tack coat with hot straight run bitumen, including consolidation with road roller of 8 to 10 tonne etc. complete. (tack coat to be paid separately)

With paving Asphalt grade VG - 10 heated and then mixed with solvent at the rate of 70 grams per kg of asphalt

Item number
16.38.1
Analysis basis
Details of cost for 100sqm.
Priced inputs
21
Derived rate
353.65

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.38.1 2.5 cm thick bitumastic sheet with hot bitumen of approved quality, using stone chippings (60% with 12.5 mm nominal size and 40% with 10 mm nominal size) @ 1.65 cum per 100 sqm and coarse sand @ 1.65 cum per 100 sqm of road surface and with bitumen @ 56 kg/cum of stone chippings and @ 128 kg/cum of sand over a tack coat with hot straight run bitumen, including consolidation with road roller of 8 to 10 tonne etc. complete. (tack coat to be paid separately) : With paving Asphalt grade VG - 10 heated and then mixed with solvent at the rate of 70 grams per kg of asphalt — is derived from 21 priced inputs and works out to ₹353.65 after water charges, GST, CPOH and cess. The full build-up is below.

  • 80/100 bitumen @56kg. per cum. of
  • aggregate and 128kg. per cum. of sand:
  • 56x1.65=92.4kg. = 0.092t +
  • 128x1.65 = 211.2kg = 0.211t
  • Solvent 0.070 kg. x 303 kg. = 21.21kg
  • Steam coal for heating bitumen @ 2 quintals
  • per tonne of bitumen = 2x0.303=0.606q
  • Labour for cleaning road surface, heating
  • bitumen mixing and spreading aggregate :
  • (a) For cleaning :
  • (b) For heating bitumen :
  • (c) For cleaning, mixing and spreading premix aggregate :
  • (d) Consolidation charges :
  • (at barriers for night watch and for road
  • roller)
  • (e) Misc :
  • Wire brush (with thick wire)
CodeInputUnitQuantityRate (INR)Amount (INR)
2916Paving Asphalt VG -10 of approved qualityPaving Asphalt VG 10 of approved qualityMaterialtonne0.30333,530.0010,159.59
2914SolventMaterialkilogram21.2132.00678.72
2910Stone chippings/ screenings 12.5/ 13.2 mm nominal sizeMaterialcum0.991,400.001,386.00
2911Stone chippings/ screenings 10/ 11.2 mm nominal sizeMaterialcum0.661,400.00924.00
0370Coal (steam)Materialquintal0.606500.00303.00
0982Coarse sand (zone III)Materialcum1.651,450.002,392.50
0128MateLabourday0.16816.00130.56
0114BeldarLabourday1.4736.001,030.40
0115CoolieLabourday1.4736.001,030.40
0114BeldarLabourday1.19736.00875.84
0130MistryLabourday0.24897.00215.28
0114BeldarLabourday6.12736.004,504.32
0113ChowkidarLabourday0.34736.00250.24
0101BhistiLabourday0.13816.00106.08
0003Hire charges of Diesel Road Roller - 8 to 10 tonneMachineryday0.133,350.00435.50
0001Hire charges of Coaltar Boiler 900 to 1400 litresMachineryday0.21900.00189.00
0023Hot Bitumen mixer 0.5 cum i/c hand cartMachineryday0.053,950.00197.50
0364Wire brushMaterialeach0.1325.003.25
0365Soft brushMaterialeach0.425.0010.00
9999Brooms and gunny bagsMaterialL.S.7.152.2716.23
9999SundriesMaterialL.S.8.972.2720.36
TOTAL
24,858.77
Add 1 % Water charges on “W”
248.59
TOTAL
25,107.36
Add GST on “X” (multiplying factor 0.2127)
5,340.34
TOTAL
30,447.70
Add 15% CPOH on “Y”
4,567.16
TOTAL
35,014.86
Add Cess @ 1% on “Z”
350.15
Cost for 100 sqm.
35,365.01
Cost per sqm.
353.65
Say
353.65

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1196. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works